Outsourcing Provider Yiwu - Polyester Surface Double Stripe PVC Mat Low Price Floormat For Outdoor Entrance – Yunis
Outsourcing Provider Yiwu - Polyester Surface Double Stripe PVC Mat Low Price Floormat For Outdoor Entrance – Yunis Detail:
Quick Details
Pattern Type
lant
Carpet Sales:Finished Carpet (piece)
Application:Hallway
Material
VC
Style:Classic
Pattern:Embroidered
Technics:MACHINE MADE
Age Group:Adults
Design
ersian
Feature:Waterproof, Corrosion-Resistant, Anti-Bacteria, Wrinkle-Resistant, Anti-slip, Adhesive-Protective
Use:DOOR, FLOOR, Bath, Outdoor, CAR
Place of Origin:Zhejiang, China
Brand Name:bbt
Color:Red
Supply Ability
- Supply Ability:300000 Piece/Pieces per Month
Packaging & Delivery
- Packaging Details:Carton/Waterproof bag/Woven bag
- Port:Ningbo
- Lead Time :
Quantity(Pieces) 1 – 100 >100 Est. Time(days) 3 To be negotiated
Product Description








| Colour: | Red/Gray/Dark red/Brown and so on | |||||
| Thickness: | 7 mm | |||||
| For Roll | ||||||
| Weight: | 2400g/m2 | |||||
| length: | 15m or more | |||||
| Width: | 90cm/100cm/120cm/160cm/180/200cm | |||||
| For Piece | ||||||
| Size: | 40×60/45×75/50×80/60×90/80×120 | |||||
| Weight: | 40×60:570g | |||||
| 45×75:800g | ||||||
| 50×80:950g | ||||||
| 60×90:1250g | ||||||
| 80×120:2250g | ||||||
Product detail pictures:




Related Product Guide:
Cooperation
"Sincerity, Innovation, Rigorousness, and Efficiency" would be the persistent conception of our enterprise with the long-term to build with each other with consumers for mutual reciprocity and mutual advantage for Outsourcing Provider Yiwu - Polyester Surface Double Stripe PVC Mat Low Price Floormat For Outdoor Entrance – Yunis, The product will supply to all over the world, such as: Lebanon, Surabaya, Angola, Our tenet is "integrity first, quality best". We have confidence in providing you with excellent service and ideal products. We sincerely hope we can establish win-win business cooperation with you in the future!
This company can be well to meet our needs on product quantity and delivery time, so we always choose them when we have procurement requirements.




